皇冠体育官网appwww.hg108.vip)是一个开放皇冠体育官网代理APP下载、皇冠体育官网会员APP下载、皇冠体育官网线路APP下载、皇冠体育官网登录APP下载的皇冠体育官网平台。皇冠体育官网APP上最新登录线路、新2皇冠体育官网更新最快。皇冠体育官网APP开放皇冠体育官网会员注册、皇冠体育官网代理开户等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博手机版网址www.aLLbet8.vip)是欧博集团的官方网站。欧博手机版网址开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。 环球UG声明:该文看法仅代表作者自己,与本平台无关。转载请注明:欧博手机版网址:Fukushima debris removal delayed by another year
发布评论

分享到:

Chinese volleyball team wear masks during Asian Cup clash
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。